Cypherite spies in Zion have confirmed the next delivery will be Sunday, May 17 at 2pm City time. We have the following intel on this courier mission:
The courier requires prepared terminals to download and upload their package from. The package is compressed code containing thousands of pills. His modified program launcher stores this compressed code package in his buffer. This compressed code and the method of storing it in the courier's buffer is not stable enough to survive teleportation. Hyperjump also risks corrupting the code. Therefore this courier will be moving on foot.
If either the Buffer Overflow 1.0 or Buffer Overflow 2.0 debuff is active at death, the courier's reconstruct timer will be reduced to one minute.
If the compressed code remains in the courier's buffer for more than 70 minutes, the risk of the code beginning to destabilize will become an increasing factor. For every ten minutes after the first 70 minutes of the compressed code being stored in the courier's buffer, there is a 20% increasing chance the upload will fail. After two hours, the compressed code becomes too unstable and the upload is guaranteed to fail.
Objectives
Cypherite and Machine Operatives
Zion and EPN Operatives
Merovingian Operatives
No proof is required for primary objectives.
Proof of completed secondary objective requires an image capture displaying /time, CQ and ‘killed by' system records. Proof should be displayed here for verification and recognition of achievements on behalf of the operative's organization. When there are mutliple objectives involving the same target, only one kill per individual operative can be credited.
Reports confirm the May 17 delivery failed. The delivery took long enough that the code began to decay in the courier's buffer. One teleportation and one revival with Restore RSI added to the Code instability which was at 80% when the upload was completed. The upload was completed but the file was corrupt, delivery failed.
PRIMARY OBJECTIVES COMPLETED
SECONDARY OBJECTIVES COMPLETED
MAY 17 SECONDARY OBJECTIVES:
ZionCourier Kills
ZionCourier Revivals
Proof of completing secondary objectives will be accepted up until the next delivery time.
Wednesday, October 1 at 6pm City time.
Hope to see many EPN participating in this, we must not fail in protecting the courier.
6 am in spain lol
null.
Reports comfirm the delivery was successful.
Successful termination of the courier executed by Lanton at 18:10:09 and Bayamos at 18:11:22.Successful revival of the courier executed by Skybruin twice, at 18:10:31 and 18:11:42.
Primary objective completed by: Zion and EPN.
Secondary objectives await proof:First operative to terminate Lanton after 6:10pm City time:First operative to terminate Bayamos after 6:11pm City time:
First operative to terminate Skybruin after 6:10pm City time:First operative to terminate Skybruin after 6:11pm City time:
Secondary objectives remain open until completed.